How Long Does It Take To Build A Pool?

If you have been thinking about investing in a pool for your home, there are definitely a lot of factors to consider. One of those factors is how long it takes to build a pool. You may be surprised to find out that it takes much less time than many people think.

build a pool

Depending on what it is you want to be installed along with any other features you want, building a new pool can take between roughly 8 and 12 weeks to complete. Below, we will cover each of the steps in the pool building process to give you a better idea of the timeline for your new backyard pool.

Design and Permitting

This is by far, one of the more difficult stages and can often take the longest. This process can take approximately one to 8 weeks. You want to make sure to achieve the pool design you love, and the permitting process depends on the municipality in which you live.

Excavation

This process can take about a week once the design has been nailed down and you have the permits. The ease of access, utility lines, and other factors may cause this timeframe to vary.

Pool Systems

Once the pool has been dug, it is then time to lay the steel, route all the electrical and plumbing and make sure everything is ready to go. This process can typically be completed in approximately two weeks, depending on the size of the pool, type of pool, and the other features you have selected.

Custom Features

This stage includes all the final touches that make your pool complete. From filling it up to adding a deck, landscaping, custom lighting, and more, these are those touches that make the pool feel more like your own. Depending on the custom finishes you have chosen for your pool, this stage can take one to four weeks to complete.

As you can see, there are many variables to consider when nailing down the timeline when you build a pool. If you still have questions, make sure to consult Tampa pool professionals and remember, the completion times can vary depending on these and other factors.